|
The second application is for the first stage [ Engineering Study ] of a LARE grant to work on trying to control the flooding. From the studies that have been done they are looking at possibly digging some sediment basins up stream in the watershed. This grant is estimated to cost about $20,000. and our portion would be about 10%. This grant will be decided in July 2008.
|